References of Reprojekt GmbH
Technical inspections and acceptances / Plant inspections during operation / Recurring inspections / Condition-based inspections
Enercon
E70 / E82 / E101 / E115 / E40 / E44 / E48 / E53
Vestas
V80 / V90 / V66 / V52
Repower / Senvion
MD77 / MM82/92 / 114M 3.2MW
Gamesa
G52 / G80 / G90 / G97
GE General Electric
1.5 SL / 2.5 / 2.75 DFIG 120 / Tacke 500e
AN Wind Energie
AN Bonus 1.3
Siemens
SWT 82 / SWT 93 / SWT 103 3 MW Direct Drive
Nordex
N90 / N100
Fuhrländer
FL 1500
Vensys
V77 / V70
Alstom
Eco 80
Vergnet
1 MW
Lagerway
LW 56 / 17
Auch interessant
Recurring Inspection (WKP)
Every 2–4 years: structural safety inspection by an accredited Type C inspection body.
Drone Inspection
High-resolution drone inspection for cost-effective and precise assessments.
Lifetime Extension & Stability
Stability reports and lifetime extension for existing wind turbines.
FAQ: Lightning Protection
Procedure, protocols and standards for lightning protection measurements on WEA.
